Our Work, Across Pakistan
Real installations. Real results.
Every project below is a system we actually designed, delivered, and switched on — browse the map or filter by the kind of site you're planning.
132
kW Installed
18
Projects
15
Cities Served
Find a project near you
Loading map…
All Projects
No photo
residential
Kaj Consultancy (20KW three phase system)
Garden East
20 kWSep 2026

residential
Installed Projects
published
6 kWAug 2026
No photo
residential
Mr Raju (4KW System)
Near Al Farooq Masjid
4 kWAug 2026
No photo
commercial
Gymshim By Nomanfitness (20 KW Hybrid System)
Malir 15
20 kWAug 2026
No photo
residential
Alishan Raheem (2 KW System)
Garden West
2 kWAug 2026
No photo
residential
Mr. Shoaib
Falanaz Dreem Villas Phase 2
8 kWAug 2026
No photo
residential
Mr. Shayan (4KW System)
Garden East
4 kWJul 2026
No photo
residential
Mr. Qadir 8KW System
Air Port
8 kWJul 2026
No photo
commercial
Mr. Kaleem 8KW System
Bin Qasim Town
8 kWJul 2026
No photo
residential
Mr. Zeeshan (10KW System)
Karachi, Malir
10 kWJun 2026
No photo
residential
Farhna
Green Town
4 kWApr 2026
No photo
residential
Mr. Rashid (4KW System)
Malir
4 kWMar 2026
No photo
residential
Mr. Zubair (10KW)
Jaam Goth
10 kWMar 2026
No photo
residential
Arif
Jam Goth
4 kWFeb 2026
No photo
residential
Samoo Goth Society (3.6 Kw System)
Karachi, Malir Samoo Goth Society
3.6 kWDec 2025
No photo
residential
Mr. Afzal
Quaidabad
6 kWDec 2025
No photo
residential
Mr. Ismail
Malir
4 kWNov 2025
No photo
residential
Mr. Amaan (6KW System)
Karachi, Malir
6 kWSep 2025